UK: As a blueprint for decarbonising commercial buildings, the refurbished Chartered Institution of Building Services Engineers’ (CIBSE) headquarters employs a combination of existing air conditioning equipment and new technology.
CIBSE moved into the offices at 91-94 Saffron Hill in Farringdon, central London at the end of 2024, after 44 years in Balham. The building, spanning lower ground with mezzanine, ground, and three upper floors, offers modern, open-plan spaces.
The 17,000ft2 building in London has undergone a major refurbishment to include training, meetings, lectures, conferences and a collaborative members area.
As commercial building owners face growing pressure to decarbonise their estates, the project demonstrates how a considered approach to retrofitting can minimise embodied carbon while improving energy efficiency to reduce operational carbon.
“Embodied carbon is the sleeping giant for us, so we’d have been foolish if we hadn’t taken that into consideration,” said CIBSE’s chief executive Ruth Carter. “When we looked at different pieces of equipment around the building, our first thought was that if the equipment works, if it’s functioning well, why would we get rid of it.”
To determine how best to balance energy efficiency with equipment reuse, specialist engineering design consultancy 21 Engineering worked with Mitsubishi Electric to assess which systems could be retained and where new equipment could deliver greater efficiency.

The old system, a City Multi YGM VRF system, running on R410A, served wall-mounted units serving the office areas and two meeting rooms.
“We reviewed the 18-year-old equipment that serves the office areas with Mitsubishi Electric who confirmed that all the parts were still available, should they ever be needed, so there was no need to replace it at this stage,” said Phil Draper, MD of London-based building services consultancy Twenty One Engineering.
Two new Mitsubishi Electric City Multi VRF systems were installed to provide heating and cooling to the refurbished members’ area and a new conference room, while two Mr Slim R32 air conditioning units serve the existing air handling unit for the conference and event space. CO2 controls adjust ventilation according to occupancy, while a PWFY air-to-water module employing R134a refrigerant uses heat recovered from the VRF system to provide hot water.
“This was the ideal project for us because it didn’t just strip out what was still perfectly usable but instead combines old and new equipment to best suit the requirements of the building and CIBSE,” explained Ellina Webb, Mitsubishi Electric’s channel marketing manager.